Case Studies
Serving global clients, building premium projects

Ore, MetallurgyChengde, Hebei
Chengde Jianlong 2000 ton/hour primary crushing and grinding equipment
- Issue
- Iron ore and metallurgical auxiliary materials are processed at the same plant. Due to the wide range in feed size and product fineness, crushing must seamlessly transition into grinding.
- Solution
- Primary crushing with gyratory crushers, secondary and fine crushing with cone crushers, and grinding in ball mills. Screening and transfer equipment are installed between stages, with oversize material recirculated in a closed circuit.
- Results
- The entire line operates at 2000 tons/hour, ensuring stable load distribution between crushing and grinding while reducing spare parts variety and maintenance workload.

Building materials, new materialsHuizhou, Guangdong
Sand and gravel aggregate crushing equipment, Huizhou, Guangdong 17000 tons/day
- Issue
- Granite has a Mohs hardness of 6-7, with raw ore diameters up to 1350 mm. Four finished product specifications must be produced simultaneously.
- Solution
- Four-stage crushing: PXZ1600 gyratory crusher paired with HG710B and HG450D multi-cylinder hydraulic cone crushers, with intermediate screening and closed-loop return.
- Results
- Daily capacity: 17000 tons; stable output of 0-5, 5-10, 10-20, and 16-31.5 mm aggregates. Second and third stages share the same model with different chamber configurations for interchangeable spare parts.

Mining, MetallurgyRussia
Crushing and Grinding Production Line for a Gold Mine in Russia
- Issue
- High-latitude mining areas face winter low temperatures and long logistics cycles, requiring equipment to start reliably in cold conditions and ensuring timely availability of spare parts.
- Solution
- Cyclone and cone crushers handle crushing, while ball mills manage grinding. Equipped with feeding and screening systems, they form a complete process from coarse crushing to grinding.
- Results
- Maintain continuous operation during cold seasons. Nearby service offices should conduct scheduled inspections and replace wear-prone parts, while expediting spare parts supply to minimize downtime.