Chengde Jianlong 2000 ton/hour crushing and grinding main production equipment

The Chende Jianlong ore and metallurgical material handling project has a design capacity of 2000 tons/hour. The project requires seamless process integration from primary crushing to grinding within a single site, demanding high continuous operation capability for both crushing and grinding stages.
Project Background
The project primarily processes iron ore and metallurgical additives, with a wide range of feed sizes and product fineness. The client aims to minimize intermediate handling, ensuring a continuous and stable production flow from crushing to grinding, while controlling dust and noise impacts on the surrounding environment.
Device Configuration
The primary crushing stage uses gyratory crushers, while cone crushers handle secondary and tertiary crushing. The grinding stage is equipped with ball mills. Screening and transfer equipment are installed between stages to close-loop return oversized material to the previous stage, minimizing ineffective crushing.
Status
The entire line is organized for production with a throughput capacity of 2000 tons/hour, ensuring stable load distribution between the crushing and grinding sections. After equipment commissioning, the variety of spare parts on-site and maintenance workload have been simplified, allowing routine maintenance to proceed as planned.
Support
Project delivery includes installation guidance, commissioning, and operational training. The service team conducts scheduled follow-ups to monitor wear on consumable parts and provide replacement recommendations.